Tuesday, January 26, 2016

construction: month five

 

Us on the second floor:

DSC02926DSC02930

The third floor, with the kitchen (below left) and the living room and powder room (below right), with a broom as a point of reference:

DSC03136DSC03137

The roof, obviously, and a view down to the entryway:

DSC03133DSC03138

It’s pretty tall and the basement is still flooded.

DSC03149DSC03167

They’ve recently put in temporary stairs, installed most of the windows and put on the roofing material.

DSC03170DSC03188

DSC03180DSC03183

No comments:

Post a Comment