Tuesday, March 22, 2016

construction: month seven

 

This month they put in the insulation and noise dampening stuff, installed one of the doors, did a bunch of blocking, framed the supports for the staircase and started on the drywall.  They used a crane to put the drywall on the second and third floors through the windows.  We did several more “last” wiring jobs and picked out our tile.

IMG_1318IMG_20160305_150623IMG_1279

This will be a recessed cabinet, not an interior window :)

 IMG_1271

Drywall and the stairwell

IMG_1320IMG_20160312_142046IMG_20160312_100523

The exterior, from today, and tiles for the bathrooms

IMG_1387IMG_1391IMG_1350