Sunday, December 20, 2015

construction: month four

 previous posts: September, October
The November post never happened so this one covers quite a lot of progress.  Since late October, they have framed out the basement interior, framed level one, installed four steel beams and framed level two.  They’ve also done half of the backfill around the basement.  I think they’re holding out on the second half of the backfill so that they can have an excuse to keep the alley blocked off and use it as a staging area.  We have such a small “yard” that they can’t even fit the building materials in it.
IMG_0912_thumb4

Level one floor (with tracks for radiant heat) and walls
DSC02218_thumbDSC02490_thumbDSC02496_thumb

Installing the beams
DSC02535_thumbDSC02545_thumbDSC02554_thumb1

Level two
DSC02653_thumb1DSC02660_thumb
DSC02666_thumbDSC02663_thumb

The last few weeks also brought a lot of rain, as you may recall.  The basement flooded several times because the drains are not yet connected to the sewer.  It’s supposed to be okay, but it’s not a pleasant sight.
DSC02481_thumbDSC02485_thumb

The current timeline says it will be done in June.